Hatley Castle
Hatley Castle, a Classified Federal Heritage Building, presented unique challenges and required solutions that seamlessly integrated with the existing structure. Our work included crucial steam boiler and control system upgrades, incorporating modern functionality while preserving the historical integrity of the castle to enhance efficiency and safety for generations to come.
Completion
2012
Scope
Plumbing, HVAC
Size
30,000 Sq. Ft.
Royal British Columbia Museum
We’ve provided essential mechanical design for the Royal BC Museum for over 40 years, ensuring its vital systems evolve with advancing technology. Our work at the original site and the new archive building has been essential in maintaining optimal climate control, energy efficiency, fire safety, and visitor comfort, keeping the museum’s operations running smoothly and protecting the museum’s priceless historic collections.
Completion
Ongoing
Scope
Fire Suppression, Plumbing, HVAC
Partnership
40+ Years
CARSA
With a focus on safety and efficiency, our team served as the commissioning authority and fire suppression engineers for the 190,000 sq. ft. Centre for Athletics, Recreation, and Special Abilities at UVic, coordinating extensively with multiple user groups to ensure seamless integration of systems that met the diverse needs of athletes, students, faculty, and accessibility-focused programs.
Completion
2015
Scope
Commissioning Authority,
Fire Suppression
Size
190,000 Sq. Ft.
BC Systems Corporation
(4000 Seymour)
Formerly the home of BC Systems Corporation, our team retrofitted the large commercial building at 4000 Seymour with an efficient heat recovery chiller system. This important upgrade reduces energy consumption and operating costs, supporting sustainability goals.
Completion
2022
Scope
Chiller Retrofit
Size
620 Tons
BC Legislature
The Legislature buildings are an essential component of our government in BC. We’ve completed numerous projects throughout our partnership: studies on converting from steam to hot water heating; the addition of cooling to specific locations; and a recent addition of exterior emergency exit stairs to the main building. We are proud to be a trusted advisor to the Legislative Buildings staff.
Completion
Ongoing
Scope
Full Mechanical, Central Steam Plant
Size